Home > Services > Bridge Design & Inspection > Manatawny Creek Bridge Replacement (S.R. 4031, Section MRM)

Client

PennDOT District 6-0
7000 Geerdes Blvd.
King of Prussia, PA 19406

Project Completion Date

December 2011

Construction Cost

$3,000,000

Project Overview

This project involved the replacement of the bridge carrying S.R. 4031 (High Street) over Manatawny Creek in the Pottstown Borough, Montgomery County as part of a PennDOT District 6-0 Multi-Bridge Contract. The project site is located in a downtown setting, and the existing bridge consisted of a three-span steel structure, along with an adjacent concrete masonry overflow arch. Hydraulics were critical on this project due to the backwater from the Schuylkill River, immediately downstream, created flooding conditions during heavy storms at the bridge.

The completed bridge consisted of a two-span continuous composite prestressed concrete bulb tee-beam superstructure supported on full height reinforced concrete abutments and a solid shaft pier. The overall span of the new bridge was 156’-6”, comprised of two 78’-3” spans measured from the centerline of the abutment bearings to the centerline of the pier. The bridge was widened to provide two 11’ through lanes, one 11’ left turn lane, and 8’ shoulders/bike lanes, along with two 7’ sidewalks. The final structure provided a waterway opening greater than the existing, eliminating an increase in flood water levels.

Significant coordination with the Borough was necessary to ensure that the aesthetics of the new bridge matched their ongoing downtown revitalization. As a result, the new structure included decorative lighting, along with architectural stone formliner matching nearby Borough landmarks.

As the Prime Consultant TPD provided the following engineering and environmental services for the design of this replacement bridge:

- Wetland Identification and Red Bellied Turtle Mitigation

- Hydrologic and Hydraulic Studies under existing and proposed conditions

- Structure TS&L Studies of alternative bridge types to determine the most cost effective bridge

- PADEP and Army Corps of Engineers 105/404 Joint Permit application

- Erosion and Sediment Pollution Control Plan

- Post-Construction Stormwater Management Plan

- NPDES Permit application

- Roadway Design and preparation of Roadway Construction Plans, Specifications and Cost Estimate

- Maintenance and Protection of Traffic Design and preparation of Traffic Control Plans

- Right-of-Way Plan and Property Plot Plan Preparation

- Final Structure Design and preparation of Structure Plans and specifications

- Construction Cost Estimate

- Pre-bid Construction Schedule