I-70 Structure Replacement Design/Build

Rostraver Township, Westmoreland County, PA

CLIENT

PennDOT District 12-0
825 N. Gallatin Avenue Ext
Uniontown, PA 15401

 

M. A. Beech Inc.
801 W. Main St.
Carnegie, PA 15106

 

PROJECT COMPLETION DATE

June 2015

 

CONSTRUCTION COST

$8,600,000

PROJECT OVERVIEW

TPD completed final design tasks for the replacement of a structure carrying I-70 over the WL&E Railroad (S.R. 0070, Section 10Q) in Westmoreland County as part of a Design/Build Team. This project included the replacement of the existing three-span concrete encased I-beam structure with a single-span spread box beam structure.

The project also involved the widening of the shoulders on the structure and on the approaches, the construction of a new concrete approach slab, the replacement of approach guide rail and the installation of storm water management facilities.

TPD’s portion of the work was completed for MA Beech, Inc. as part of a Design/Build agreement.

Project Responsibilities:

- Structure Plans

- Traffic Control Plans

- Roadway Plans

- Erosion and Sediment Pollution Control Plans

- Utility Coordination

- Railroad Coordination

- Public Involvement

PennDOT District 8-0

Service(s): Bridge Design
Client(s): PennDOT District 8-0

Upper Uwchlan Township, Chester County, PA

Service(s): Bridge Design
Client(s): PA Turnpike Commission

Philadelphia, PA

Service(s): Construction Management Inspection Services
Client(s): PennDOT District 6-0